Green Pakistan Initiative has become a beacon of hope for Balochistan.
In the first phase of Green Pakistan Initiative, forty solar tube wells were installed in Balochistan.
As a result of the tube wells, 800 hectares of land were irrigated.
In the second phase, an additional 83 solar tube wells were installed.
With the help of these solar tube wells, 1,660 hectares of land were made cultivable.